What are the preparations before using the conference room sound system?

Views:

The conference room sound system is directly related to the success of the meeting, although it is only used as an auxiliary facility, but its role should not be underestimated. As a popular conference room sound system, in the quality of the level at a higher level, give the service category comprehensive and in place, naturally can develop into a highly rated conference room sound system. Then before the official launch of the conference room sound system, there are some necessary preparations must be done.

 

 

1, check the smoothness of the network transmission line

Conference room sound system should be done before the use of inspection work, including the network transmission line view, confirm the smoothness of the entire line can be, if the network signal is obviously unstable conditions, it is necessary to switch to the alternate transmission line. To know the stability of the transmission line is directly related to the quality of sound transmission, be sure to check the line smoothness.

2, by walking back and forth to confirm the quality of the loudspeaker intact

Conference room sound system before the use of preparatory work, including the confirmation of the loudspeaker, taking into account the loudspeaker will have an impact on the range of transmission, it is necessary to loudspeaker quality is intact. Specific monitoring methods for walking back and forth in the conference room, through the interaction with the microphone to listen to the sound of the loudspeaker, clear loudspeaker can normally spread the sound that represents the end of the test.

3, with the help of song playback to troubleshooting sound faults

Conference room sound system before the use of sound fault detection, in order to avoid the sound of high and low ups and downs, or intermittent situations, this step can not be omitted. May wish to play a song with the help of a song, in three or four minutes or so, as soon as possible to confirm whether the sound playback faults, this part of the content must be carried out in advance, in order to strive for sufficient time to solve the problem.

Conference room sound system before the use of the preparatory work consists of three parts, mainly around the detection of various parts of the system to start, especially when the conference room sound system has not been used for a long time, these three steps can not be easily ignored. After the interlocking inspection work, after the impression of the use will become smoother, showing good results.

Contact Us

 

 

Address: B6, Zone 2, Enping Park, Jiangmen Industrial Transfer Park, Enping City, Guangdong Province, China

 

E-mail:N9Audio@126.com

 

Tel:+86 13113732988

 

Landline:4008-303-823

 

 

Swipe to Follow Us on Public